top of page

PRESS RELEASES

PRESS RELEASE

IN THE NEWS

IN THE NEWS

May 7, 2019

Pre-Switch launches 200kW SiC inverter evaluation system (Semiconductor Today)

April 26, 2019

Three-phase gate drivers double power, boost switching speeds by up to 20x

April 17, 2019

Pre-Switch launches CleanWave 200kW SiC inverter evaluation system (Power Electronics News)

April 2, 2019

Vehicle Electronics Magazine: AI Solves Soft-Switching Problems (PDF, Pg. 32)

Email
info@pre-switch.com

​

Address
2151 O'Toole Ave

Unit 30

San Jose, CA 95131

United States of America

​

  • Pre-Switch Linkedin
If you are interested in making soft-switching work for you, please reach out here:

Thanks! Message sent.

© 2018 - All rights reserved Pre-Switch, Inc.  Privacy policy
bottom of page